ev charging station on the map
Back to Map

On the Run Charging Station - Burnaby Lougheed Hwy EV Charging Stations

On the Run
EV charging station is closed. The closest charging location is at 3030 Boundary Road in Burnaby. We apologize for the inconvenience.

EV Charging Station Information

On the Run EV
CHARGE. EARN. SAVE. Download the Journie app and get rewards. There is no cost to join. Earn and redeem points with EV charging to save 20¢/kWh* at participating locations. Earn 3 points for every kWh charged in the app. Pay with Journie Rewards App. Simultaneous ultra-fast EV charging (max CCS 200 kW, max CHAdeMO 100 kW). These chargers use an internal battery to ease the burden on the electrical gird and allow us to place more chargers in more locations to serve EV drivers. Max charging speeds may vary. Charging your vehicle may take longer when Power Conservation Mode appears on the charger screen after high usage. Learn more at OnTheRunEV.ca
6751 Lougheed Highway, Burnaby, BC, V5A 1W1
Public
24 Hours
Network App
+1 604-420-5440
https://www.ontherunstores.com/ev-charging

EV Charging Station Actions

Report

Share

Edit

Log in

EV Charging Stations Ports

bornes de recharge
CCS
3 Ports
Level 3 Charging Station - Cost: Unknown
EV Charger
Last used over 2 weeks ago
borne electrique
CHAdeMO
1 Port
Level 3 Charging Station - Cost: Unknown
EV Charger
Last used over 2 weeks ago

EV Charging Station Photos

EV Drivers Comments

Anonymous
89e3b3762f939b29a792c1202fdac155
2 months ago
Station closed
Anonymous
7 months ago
unavailable
On the Run
8 months ago
PRICING DECREASE: Please be advised that decreased rates will take effect on May 1, 2025 at this charging location. Refer to Journie Rewards App or charger screen for up-to-date pricing info.
khozestani.mohammad
11 months ago
Charged successfully.
sk8inmonkey
2 years ago
limited to 40kw.
DeepInCharge
2 years ago
gotta pay to charge now. I got 30kw/hr while charging for half hour today.
DeepInCharge
2 years ago
starts at 25kw and goes down to 9kw after 5 mins
Anonymous
2 years ago
Charged successfully.
Anonymous
2 years ago
I had a positive experience.
implode
3 years ago
station 76 has both ports red. station 77, chademo port is occupied by first gen white leaf that the charger says is at 98% and he wants to go to full. he's already been charging for over 40m and says it will be another hour before he's done. though the sign says 20-30m,he doesn't care as he says others don't adhere to that either.