200kW stations (stations 3 and 4) do not work. Isolation tests time out and charging does not start. 100kW stations (1 and 2) has loose locking mechanisms on CCS connector and may fail to start, but work once connected. Station 1 appears to top out at 88kW
E Needler
4 years ago
Great charge station. Level 2 chargers are on the back side of the building, and Level 3 chargers are on the south side of the building visible from the road.