This charging station has recently been reported as defective by other users. We invite you to check the latest comments from other drivers for real-time updates on the stations condition and availability.
I was here 2026 Jan 01 after a harrowing drive from Kananaskis Travel centre where the On The Run charger was not working and the Flo charger was unreachable due to deep unplowed snow. I barely made it to Canmore and the found both PetroCan chargers failed to initialize to my BoltEV. I luckily made it to the Electrify Canada on the East side with no charge left in the car and successfully charged there
jmoguly
6 months ago
do not charge here, limited to slow charge since it's pay per minute, avoid at all costs
jmoguly
6 months ago
super slow, probably limited by owners since it's charge per minute, of the 350kw avail, it maxed out at 35kw
ken.dalton.KD
6 months ago
Charged successfully.
Anonymous
6 months ago
no change at petrocanada, disappointed
jaywildcat
6 months ago
One of the stations is down (screen off), the other one works.
Took me forever to get the CCS1 connector to click in — same issue I had in Kamloops a few days ago. Tried every angle and force, it just wouldn’t lock until the last try.
Good news: it’s free.
Bad news: 350 kW charger only gave me 66 kW with a warm battery.
hilaryjbrown50
8 months ago
Card reader not working. Petro-Canada also not working in many other places. Drove through Vancouver to Calgary two weeks ago as well and many not working. Petro Canada needs to up their game.