Front of lot, fast. A little busy might wait. Clean with a trash can.
Anonyme
2 ans
Charged with no issues. All 4 terminals are working. 2@350kw and 2@150kw.
Anonyme
2 ans
Worst spot I’ve ever charged. Need to be cut throat to get a spot, it is so busy and cars are parked around the spots with blinkers on to wait. Then the through way traffic directly behind the spots, with cars driving too fast. Continue on…don’t stop.
Noreaster
2 ans
Charger #2 just hit 130kW.
chipafer
2 ans
1 150kW charger (with CHAdeMO) was down. 2 350kW and 1 150kW chargers were working.
gavin_l
2 ans
A maintenance crew was onsite and two of the chargers were inoperable. The 350kw charger we used was running at 30-50kw the whole time.
z87ybvnkzr
3 ans
Only 1 of the 4 stations work.
Anonyme
3 ans
Only 2 of 4 were connected to the network. One credit card reader was not accepting cards. Only one functioning charger available for non members.