Charging Station Energy
0.3 CAD per kWh
Parking
07:00 AM - 10:00 PM 3 CAD per hour After 30 mins of grace Period
EV Charger Dernière utilisation il y a plus de 2 semaines
NEMA 5-15
1 Borne
Level 1
Charging Station 24.00$ / hr
EV Charger Dernière utilisation il y a plus de 2 semaines
CCS & CHAdeMO
1/1 Disponible
Level 3
Charging Station 24.00$ / hr
EV Charger Dernière utilisation il y a 2 jours
EV Charging Station Photos
EV Drivers Comments
Anonymous
scrynet
3 weeks ago
Very finicky charger. start charge on app or screen first. then plug in.
ChargeHub Support
4 weeks ago
User City of Pickering has changed the information of this public charging location. The ChargeHub Team appreciates the contribution—thank you City of Pickering!
scrynet
3 months ago
Max charge is 70kw, dont recommend for the price.
City of Pickering
4 months ago
Each DC charger has both CCS1 and NACS connectors. 125 kW is shared between the two DC chargers. Vehicles with 400V architecture will typically max out at ~70-80 kW as the cable and connector are rated for 200A max (as is typical for all chargers without liquid-cooled cables/connectors). The Level 2 charger ports have native J1772 and NACS connectors (select connector on screen) and are capable of delivering up to 16.6 kW per port (not shared).