Niveau 3 Borne de Recharge - $45.00/hr: $45.00 per hour
Loitering policy:
- After the vehicle has stopped drawing power for 30 minutes, you pay an extra:
$5.00 per hour
Borne de Recharge Dernière utilisation il y a 5 jours
CCS
2/2 Disponible
Niveau 3 Borne de Recharge - $45.00/hr: $45.00 per hour
Loitering policy:
- After the vehicle has stopped drawing power for 30 minutes, you pay an extra:
$5.00 per hour
Borne de Recharge Dernière utilisation il y a 2 jours
Connecteur J1772
1/1 Disponible
Niveau 2 Borne de Recharge - 2.00$ / hr
Borne de Recharge Dernière utilisation il y a 2 jours
Photos de Borne de Recharge
Commentaires
Anonyme
10b48e7bb8ca2d3e7485d97410251625
7 mois
NEW LEVEL 2 CHARGER HAS BEEN INSTALLED/ONLY ONE PLUG. ORIGINAL LEVEL 2/3 STATION OUT OF SERVICE. DEC. 9, 2024-LEVEL 2 CHARGE OK 6kW/30A.
faulknertj
7 mois
The level 3 charger is not working. The level 2 is.
Niveau 3 Borne de Recharge - $45.00/hr: $45.00 per hour
Loitering policy:
- After the vehicle has stopped drawing power for 30 minutes, you pay an extra:
$5.00 per hour
Borne de Recharge Dernière utilisation il y a 5 jours
CCS
2/2 Disponible
Niveau 3 Borne de Recharge - $45.00/hr: $45.00 per hour
Loitering policy:
- After the vehicle has stopped drawing power for 30 minutes, you pay an extra:
$5.00 per hour
Borne de Recharge Dernière utilisation il y a 2 jours
Connecteur J1772
1/1 Disponible
Niveau 2 Borne de Recharge - 2.00$ / hr
Borne de Recharge Dernière utilisation il y a 2 jours