Welcome to Azouzetta Lake Lodge, BC Hydro provides the following public EV charging services:1 x DC Fast Charger2 x Level 2 ChargersConnector Types: CCS, CHAdeMO & J1772Chargers can be activated using the BC Hydro EV App, QR code, or RFID Card.For more information on the BC Hydro EV charging network and our available roaming partners, visit: bchydro.com/evIf you require assistance activating your charging session, please contact our 24/7 Public Fast Charging Support Team at 1 866 338 3369.Download the BC Hydro EV app by searching BC Hydro EV in the Apple App Store or Google Play Store.This device is temporarily authorized to be used for the purpose of obtaining the basis of a charge for electricity, under terms and conditions established by Measurement Canada.We gratefully acknowledge the financial support of the Province of British Columbia through the Ministry of Energy, Mines and Low Carbon Innovation.
Mile 125 John Hart Highway, Fraser-Fort George G, BC, V0J 2C0
POWER OUTAGE REPORTED: A Power Outage has been reported in the area and our Fast Charger may be currently unavailable. Please make this a consideration for travel plans in this area. Please view the outage map or list at http://www.bchydro.com/outages for details and updates.
BC Hydro
3 mois
PRICING UPDATE: Please be advised that new rates will take effect on April 1st 2025:
DCFC: $0.3609 /kWh + GST + Idle fee: $0.40 per min after 5-minute grace period
L2: $0.2972 /kWh + GST (no idle fee)
Thank you for your patience and understanding
BC Hydro
7 mois
POWER OUTAGE REPORTED: A Power Outage has been reported in the area and our chargers may be currently unavailable. Please make this a consideration for travel plans in this area. Please view the outage map or list at http://www.bchydro.com/outages for further details and updates.
Anonyme
9 mois
Middle of the night. Card reader not working. No cell service. ??
BC Hydro
10 mois
UPDATE: Please be advised there will be additional construction work at this site including the installation of a snow shelter this Fall. Please be mindful of the concrete pads and bolts on either sides of the chargers which will be covered up this week. Thank you for your patience.
BC Hydro
10 mois
NOW OPERATIONAL: Please be advised that final testing has been completed and this site is now open and available to the public. Thank you for your patience.