Niveau 2 Borne de Recharge - $2 service fee + $0.45/kWh.
Borne de Recharge
Photos de Borne de Recharge
Commentaires
Anonyme
kubeto
7 ans
Charged successfully.
Anonyme
7 ans
The station is defective. Anytime you plug in, there is a fault message
joeciriany
7 ans
you need to drive in to P1 parking lot and pay $3.00 for the first hour. but the charger is free. drive in the first gate all the way in to the back make a left all the way before you drive to the outside area it will be on the left side.
Robert Anthony Marshall
8 ans
checked-in
nzacchino
8 ans
checked-in.
terrymd01
9 ans
cost is free for J1772 ports altho you do have to pay for parking.