Niveau 3 Borne de Recharge - $1.00 connection fee, price per minute based on vehicle demand, $0.32 per min at 50 kW, $0.38 per min at 100 kW, $0.45 per min at 150 kW.
Borne de Recharge
Photos de Borne de Recharge
Commentaires
Anonyme
Lyriq-jrm19
4 mois
Charged successfully.
ehrenk
8 mois
Plugs 2 & 4 started but quit after a minute. Called the number and was told this is a known issue with eGMP vehicles. The CSR kicked plug #1 over to free so I was able to charge at 60kW. So YMMV.
23f8bf276969c9d0968f80ed65a8be4e
9 mois
Charged successfully.
garethbyatt
10 mois
Easy to find and easy to start, only managed 37kW, which is slow when you claim to be able to do 150.
A3632
11 mois
Charged successfully.
MB JTguy
2 ans
Outside temp around 5c and charge selected as 100kwh but highest it goes up is 33kwh and still getting charged for 100kwh speed.
stacyrosien
2 ans
Decent speed at 150kwh level. I pulled in 70kw most of the top up to 80%. All 4 chargers seemed to be available and functioning.
oshaneford
2 ans
Charged successfully.
f9gsdk26qw
2 ans
Dropped in for a level 3 charge but because it was a weekday it was around noon and electricity rates were high it only charged at level 2.
Raigen01
2 ans
Charging at an average 50kW. No other vehicles at chargers.
Niveau 3 Borne de Recharge - $1.00 connection fee, price per minute based on vehicle demand, $0.32 per min at 50 kW, $0.38 per min at 100 kW, $0.45 per min at 150 kW.