Welcome to Surrey - Tynehead, BC Hydro provides the following public EV charging services:
2 x DC Fast Chargers
Connector Types: CCS & CHAdeMO
Chargers can be activated using the BC Hydro EV App, QR code, or RFID Card.
For more information on the BC Hydro EV charging network and our available roaming partners, visit: bchydro.com/ev
If you require assistance activating your charging session, please contact our 24/7 Public Fast Charging Support Team at 1 866 338 3369.
Download the BC Hydro EV app by searching BC Hydro EV in the Apple App Store or Google Play Store.
This device is temporarily authorized to be used for the purpose of obtaining the basis of a charge for electricity, under terms and conditions established by Measurement Canada.
Niveau 3 Borne de Recharge - $0.3609(CAD) per kWh + tax + Idle fee $0.40 per minute(5 mins grace period)
Borne de Recharge Dernière utilisation il y a moins de 24 heures
Photos de Borne de Recharge
Commentaires
Anonyme
BC Hydro
3 mois
PRICING UPDATE: Please be advised that new rates will take effect on April 1st 2025:
DCFC: $0.3609 /kWh + GST + Idle fee: $0.40 per min after 5-minute grace period
L2: $0.2972 /kWh + GST (no idle fee)
Thank you for your patience and understanding
BC Hydro
4 mois
TEMPORARY CHAdeMO CLOSURE (BC1-AB003): Please be advised that this Fast Charger is temporarily closed for CHAdeMO repairs and will remain closed until repairs are complete. BC1-10018 remains fully operational. Thank you for your patience.
BC Hydro
7 mois
POWER RESTORED: Power has been restored and the charging station is fully functional. Thank you for your patience.
BC Hydro
7 mois
POWER OUTAGE REPORTED: A Power Outage has been reported in the area and our chargers may be currently unavailable. Please make this a consideration for travel plans in this area. Please view the outage map or list at http://www.bchydro.com/outages for further details and updates.
BC Hydro
11 mois
CAUTION: Please be advised that there is a wasp nest close to our DCFC station. Please make this a consideration when using our Fast Chargers. We are working with our contractors to have the wasp nest removed as soon as possible. We apologize for the inconvenience and thank you for your patience
BC Hydro
2 ans
TEMPORARY CHAdeMO CLOSURE (BC1-10018): Please be advised that this Fast Charger is temporarily closed for CHAdeMO repairs and will remain closed until repairs are complete. CCS charging and BC1-AB003 remain operational. A Technician has been assigned. Thank you for your patience.
BC Hydro
2 ans
PRICING UPDATE: Please be advised that effective May 1st, 2024, energy-based billing ($ per kWh) will apply at all of our public EV chargers. Level 2 charging will cost $0.2865/kWh and DC Charging for Fast Chargers rated 25 kW and higher will cost $0.3479/kWh. Please note that idle fees also come into effect at our Fast Chargers starting May 1st, 2024. Once your vehicle finishes charging, you'll have five minutes to disconnect before being charged a $0.40 per-minute idle fee. Thank you for your patience.
Anonyme
2 ans
I had a negative experience.
Anonyme
2 ans
Charged successfully.
BC Hydro
2 ans
TEMPORARY CLOSURE (BC1-10018): Please be advised that this Fast Charger is temporarily closed for repairs and will remain closed until repairs are completed. A Technician is currently being assigned. BC1-AB003 remain operational. Thank you for your patience.