borne de recharge sur la carte
Retour à la carte

BC Hydro - Rogers Pass Discovery Centre Bornes de Recharge

BC Hydro
UPDATE: While construction is currently underway by Parks Canada, our EV chargers remain open and accessible. Please use caution when entering and exiting this site and follow all on-site instructions to ensure everyone's safety.

Bornes de Recharge Information Générale

BC Hydro EV
Welcome to Rogers Pass Discovery Centre, BC Hydro provides the following public EV charging services: 1 x DC Fast Charger 1 x Level 2 Charger Connector Types: CCS, CHAdeMO & J1772 Chargers can be activated using the BC Hydro EV App, QR code, or RFID Card. For more information on the BC Hydro EV charging network and our available roaming partners, visit: bchydro.com/ev If you require assistance activating your charging session, please contact our 24/7 Public Fast Charging Support Team at 1 866 338 3369. Download the BC Hydro EV app by searching BC Hydro EV in the Apple App Store or Google Play Store. This device is temporarily authorized to be used for the purpose of obtaining the basis of a charge for electricity, under terms and conditions established by Measurement Canada.
9520 Trans-Canada Highway, Rogers Pass, BC, V0E 2S0
Publique
24 Heures
ChargeHub App, Appli Réseau, Carte RFID
+1 866-338-3369
https://www.bchydro.com/ev

Actions Borne de Recharge

Signaler

Partager

Modifier

Se connecter

Bornes

bornes de recharge
CCS & CHAdeMO
1/1 Disponible
Niveau 3 Borne de Recharge - $0.3609(CAD) per kWh + tax + Idle fee $0.40 per minute(5 mins grace period)
Borne de Recharge
Dernière utilisation il y a 4 jours
borne electrique
Connecteur J1772
1/1 Disponible
Niveau 2 Borne de Recharge - $0.2972(CAD) per kWh + tax
Borne de Recharge
Dernière utilisation il y a 5 jours

Photos de Borne de Recharge

Commentaires

Anonyme
BC Hydro
3 semaines
POWER RESTORED: Power has been restored and our charging stations are now fully operational. Thank you for your patience.
BC Hydro
3 semaines
POWER OUTAGE REPORTED: A Power Outage has been reported in the area and our chargers may be currently unavailable. Please make this a consideration for travel plans in this area. Please view the outage map or list at http://www.bchydro.com/outages for further details and updates.
vivianpyka
5 semaines
could not charge our Tesla despite having an adapter that fit. After 2 1/2 hours we figured out it wasn't a level 3 adapter. Begging a warden to let us charge at the Parks Canada charger. We would have been hooped otherwise. There needs to be more Chargers and government should force universal adapters.
BC Hydro
2 mois
PLANNED POWER OUTAGE: Please be advised that this Site is temporarily closed Today (November 10th, 2025) from 8:00 AM to 4:00 PM PST , while our crews complete emergent work for system improvements. Please make this a consideration for travel plans in the area. We apologize for any inconvenience and thank you for your patience.
BC Hydro
4 mois
REPAIRS COMPLETE (BC1-00053) : Please be advised that repairs have been completed and our charging stations are now fully operational. Thank you for your patience.
BC Hydro
4 mois
TEMPORARY CLOSURE (BC1-00053): Please be advised that this Fast Charger is temporarily closed for repairs and will remain closed until repairs are complete. BC2-AB2002 remains operational. Thank you for your patience while we work to resolve the issue.
BC Hydro
4 mois
POWER OUTAGE REPORTED: A Power Outage has been reported in the area and our chargers may be currently unavailable. Repair crews are currently on-site & We expect power to be restored to our charging stations by Sep 3 2025 4:00PM. Please note that this is an estimated timeline and may vary depending on site conditions. Please make this a consideration for travel plans in this area. Please view the outage map or list at http://www.bchydro.com/outages for further details and updates.
BC Hydro
4 mois
PLANNED POWER OUTAGE: Please be advised that this Site will be temporarily closed on September 2nd to September 6th starting at 8 AM to 8 PM, while our crews complete emergent work for system improvements. Please be aware that the start time is estimated and that this scheduled power outage may be cancelled due to adverse weather conditions or availability of crews during an emergency. Please make this a consideration for travel plans in the area. We apologize for any inconvenience and thank you for your patience.
BC Hydro
5 mois
PLANNED POWER OUTAGE: Please be advised that this Site will be temporarily closed on Tuesday August 26th from 0800-1800pst and Wednesday August 27th from 0800-1800pst, while our crews complete emergent work for system improvements. Please be aware that the start and end times are estimated and that this scheduled power outage may be cancelled due to adverse weather conditions or availability of crews during an emergency. Please make this a consideration for travel plans in the area. We apologize for any inconvenience and thank you for your patience.
BC Hydro
5 mois
PLANNED POWER OUTAGE: Please be advised that this Site will be temporarily closed on August 23rd and August 24th starting at 8 am (both days), while our crews complete emergent work for system improvements. Please be aware that the start time is estimated and that this scheduled power outage may be cancelled due to adverse weather conditions or availability of crews during an emergency. Please make this a consideration for travel plans in the area. We apologize for any inconvenience and thank you for your patience.

Actions Borne de Recharge

Signaler

Partager

Modifier

Se connecter

Bornes

bornes de recharge
CCS & CHAdeMO
1/1 Disponible
Niveau 3 Borne de Recharge - $0.3609(CAD) per kWh + tax + Idle fee $0.40 per minute(5 mins grace period)
Borne de Recharge
Dernière utilisation il y a 4 jours
borne electrique
Connecteur J1772
1/1 Disponible
Niveau 2 Borne de Recharge - $0.2972(CAD) per kWh + tax
Borne de Recharge
Dernière utilisation il y a 5 jours

Trouver des Bornes EV Près de Vous

Trouver des Bornes

Bornes EV à Proximité