Welcome to Good Hope Lake, BC Hydro provides the following public EV charging services:
1 x DC Fast Charger
1 x Level 2 Charger
Connector Types: CCS, CHAdeMO & J1772
Chargers can be activated using the BC Hydro EV App, QR code, or RFID Card.
For more information on the BC Hydro EV charging network and our available roaming partners, visit: bchydro.com/ev
If you require assistance activating your charging session, please contact our 24/7 Public Fast Charging Support Team at 1 866 338 3369.
Download the BC Hydro EV app by searching BC Hydro EV in the Apple App Store or Google Play Store.
This device is temporarily authorized to be used for the purpose of obtaining the basis of a charge for electricity, under terms and conditions established by Measurement Canada.
Charging Station $0.3609(CAD) per kWh + tax + Idle fee $0.40 per minute(5 mins grace period)
EV Charger Dernière utilisation hier
Connecteur J1772
1/1 Disponible
Level 2
Charging Station $0.2972(CAD) per kWh + tax
EV Charger Dernière utilisation il y a plus de 2 semaines
EV Charging Station Photos
EV Drivers Comments
Anonymous
BC Hydro
2 weeks ago
BC Hydro EV Announcement
SITE UPDATE: DC fast charging available again at this site, along with Level 2 charging.
The current fast chargers operate at 2025 kW and there are fewer fast charging ports available than previously. Charging times may be longer, please take this into consideration when planning your travel into this area.
BC Hydro
4 months ago
MAINTENANCE CLOSURE (BC1-FW002): Please be advised that this charging station is temporarily closed for maintenance. Please make this a consideration for travel plans in the area as this charger is unavailable. Level 2 Charger on site; BC2-AB2014 remains fully operational. We apologize for the inconvenience and thank you for your patience.
BC Hydro
6 months ago
UPCOMING MAINTENANCE CLOSURE: Please be informed that this site will undergo temporary closure for maintenance on September 15 from 8 AM to 3 PM. Kindly be aware that this is a projected timeline and may change based on site conditions. Please make this a consideration for travel plans in the area as the charging stations will be unavailable during this time. We apologize for the inconvenience and thank you for your patience.
BC Hydro
12 months ago
PRICING UPDATE: Please be advised that new rates will take effect on April 1st 2025:
DCFC: $0.3609 /kWh + GST + Idle fee: $0.40 per min after 5-minute grace period
L2: $0.2972 /kWh + GST (no idle fee)
Thank you for your patience and understanding
vgjnqp4d6t
12 months ago
Station moved and completed. No longer necessary since it’s open
BC Hydro
2 years ago
NOW OPERATIONAL: Please be advised that charger commissioning has been completed and both the Fast Charger and Level 2 are now available to the public. Please note the chargers will be kept in Free Vend Mode until a Hot Spot solution for App activation is installed this Fall. Please plug in the appropriate connector and use the touchscreen display to activate a session. Thank you for your patience.