First charger (Pat) only went up to 17kW, then switched to the second (Jerry) and was at 40kW.
Location Summary
This charging station is located in the city of Williams. It is maintained by the EVgo network, and has 2 J1772 Ports, and 2 CHAdeMO-J1772 Combo Ports.